(55884) Evanston Campus Network Equipment Maintenance 2020 Ridge 3rd & 4th Floors

Scheduled for Feb 26, 06:30 - 07:00 CST

Scheduled

Northwestern Information Technology will be making a software configuration change to the wired network infrastructure at the location in the title. There will be a brief interruption, less than 1 minute as the change is made. This work is being performed to enable Network Authentication on the infrastructure. Devices that do not support Network Authentication will continue to operate normally. Additional information about the refresh project can be found at the following link. https://www.it.northwestern.edu/about/it-projects/data-network-authentication-deployment/
Posted Feb 20, 2026 - 15:11 CST
This scheduled maintenance affects: Voice Services (Telephone Services (Videoconferencing and Telephones)) and Infrastructure (Wired Network Services (Network Connectivity), Wireless Network Services (Network Connectivity)).